CSSP-2000 Power Generation Simulation System

概述

The simulation system realizes the simulation of the substation integrated automation system and the equivalent grid around the substation.

适用范围

The system covers turbine, boiler, generator, main control system, desulfurization, denitration, auxiliary control system and booster station. Applicable to training centers, training bases and training classrooms of major groups.
特点

Provide solutions for translation and virtual DPU for control system simulation.

Remote simulation training technology.

Vivid electrical local simulation technology.

Complete electrical network calculation software and 3D technology.

Open training evaluation software.

One machine multi-mode training function.

Simulation control integrated technology.

Gas turbine operation performance analysis and equipment characteristics research.

Control system simulation operation, personnel training, parameter setting and logic optimization.

The simulation algorithm of mainstream gas turbine manufacturers is mature.